Our company provided design-build services on this 96,000 sq ft manufacturing center. It features two 750 ft synchronous flow, “Just in Time” fabrication halls which allow the company to reduce labor costs by 50%. The two halls are serviced by seven 10-ton cranes, which run the entire 750 ft length of the building and 37 gib cranes. One of the halls contains a massive 100 ft by 45 ft paint booth. The other hall features an 800 ft monorail coating system. A 4,000 amp, 460-volt service panel supplies the factory’s electrical needs. This project was completed in a short 6 months.

Location: Mt Vernon, MO