Copeland Manufacturing which manufactures air conditioner compressor components decided to expand their existing facility located in Ava, Missouri. Phase One was awarded to us as a result of a reverse bid auction. The 50,000 square foot building was finished in 2003. Copeland Manufacturing was very satisfied with the finished product, and awarded us Phase Two about 1 year later. Phase Two was a much larger project priced at a little over $8 mIllion.

Location: Ava, MO